2014-2015
Constriction of the “PGU-370” (CCPP). Main building. Assembling of the gas turbine, steam turbine, HRSG, exhaust stack, main and auxiliary equipment, high and low pressure pipelines, fuel gas preparation unit.
Feedback about performed work, JSC «Electroizolit»