Urengoyskaya GRES Power Plant

2010

PGU-450 (CCPP 450 MW) construction. Overhead cranes assembling. Laying foundations for gas turbines.

2011

Assembling of the steam turbine (K-160-7.5), main and auxiliary equipment, high and low pressure pipelines and in-plant gas pipelines.

2012-2013

Check-up of the low pressure piping valves of STP and GTP. Installation of metal structures in main building. Laying foundations for steam turbine.

2014

Repair of the generator (TZFP-160-2MUZ)

2015

Repair of the generator (TZFP-160-2MUZ)