History

2002

In 7th august 2002 officially registered Joint Stock Company «Assembling of thermal and power equipment and rendering of services»

2002

Talimarjan TPP (Uzbekistan) Construction of the Talimarjan GRES Power Plant 800 MW.
Nadzhibia TPP (Iraq) Major repair of the two turbines and replacement of the four boilers.

2003

NPP «Bushehr» (Islamic Republic of Iran) Assembling of the turbine unit (K-1000-60/3000-3).
Talimarjan TPP (Uzbekistan) Construction of the Talimarjan GRES Power Plant 800 MW.

2004

NPP «Bushehr» (Islamic Republic of Iran) Assembling of the turbine unit (K-1000-60/3000-3).
Talimarjan TPP (Uzbekistan) Construction of the Talimarjan GRES Power Plant 800 MW.
Talimarjan TPP (Uzbekistan) Maintenance of the unit №1. Turbine and auxiliary equipment inspection.

2005

NPP «Bushehr» (Islamic Republic of Iran) Assembling of the turbine unit (K-1000-60/3000-3).
Talimarjan TPP (Uzbekistan) Maintenance of the unit №1. Turbine and auxiliary equipment inspection.
Yaroslavl CHPP-1 (Russia) Rotor turning gear renovation.

2006

NPP «Bushehr» (Islamic Republic of Iran) Assembling of the turbine unit (K-1000-60/3000-3).
Talimarjan TPP (Uzbekistan) Maintenance of the unit №1. Turbine and auxiliary equipment inspection.
Ivanovo GRES Power Plant (Ivanovskie PGU) (Russia) Assembling of heat and power equipment (Unit №1)
Yaroslavl CHPP-1 (Russia) Thermal and mechanical equipment repair.

2007

NPP «Bushehr» (Islamic Republic of Iran) Assembling of the turbine unit (K-1000-60/3000-3).
Talimarjan TPP (Uzbekistan) Maintenance of the unit №1. Turbine and auxiliary equipment inspection.
Ivanovo GRES Power Plant (Ivanovskie PGU) (Russia) Start-up and commissioning operations (Unit №1). Dismantling of civil structures in turbine shop.
Kaliningrad TPP-2 (Russia) Replacement of a inlet air filter unit. Assembling of a heat transport system.
Tazhiatash TPP (Uzbekistan) Repair of the generator rotor (Unit 200 MW).
Syrdarya TPP (Uzbekistan) Repair of the turbine (K-300-240). Technical assistance in repair.
Reftinskaya GRES Power Plant (Russia) Replacement of the generator (Unit №10, 500 MW).
GTPP «Etelebou» (Nigeria) Assembling of the three gas turbine power unit (the capacity of each 20 MW).
CHPP-23 Mosenergo (Russia) Gas pipelines replacement.
CHPP-9 Mosenergo (Russia) Gas duct replacement.
CHPP-11 Mosenergo (Russia) Air inlet system repair (boiler №10).

2008

NPP «Bushehr» (Islamic Republic of Iran) Assembling of the turbine unit (K-1000-60/3000-3).
Talimarjan TPP (Uzbekistan) Maintenance of the unit №1. Turbine and auxiliary equipment inspection.
Ivanovo GRES Power Plant (Ivanovskie PGU) (Russia) Main and auxiliary equipment assembling (Unit №2). Dismantling and assembling of the gas-turbine (GT №12). Repair of the condensed water storage tank, boiler pass, turbine-generator (GP-1) and steam turbine (PT-10).
Kaliningrad TPP-2 (Russia) Civil works, unit №2 (PGU-450).
Angren GRES Power Plant (Uzbekistan) Repair of the turbine (K-100)
Syrdarya TPP (Uzbekistan) Repair of the turbine (K-300-240). Technical assistance in repair.
Reftinskaya GRES Power Plant (Russia) Replacement of the generator (Unit №10, 500 MW).
GTPP «Etelebou» (Nigeria) Assembling of the three gas turbine power unit (the capacity of each 20 MW).

2009

NPP «Bushehr» (Islamic Republic of Iran) Assembling of the turbine unit (K-1000-60/3000-3).
Talimarjan TPP (Uzbekistan) Maintenance of the unit №1. Turbine and auxiliary equipment inspection.
Razdan TPP (Republic of Armenia) Assembling of the turbine, generator and auxiliary equipment (Unit 300 MW).
Ivanovo GRES Power Plant (Ivanovskie PGU) (Russia) Assembling of auxiliary equipment and high pressure pipelines of delivery water and auxiliary steam (Unit №2).
Kaliningrad TPP-2 (Russia) Major repair of the steam and gas turbines, generators and auxiliary equipment of the unit №1. Construction of service water system and refrigerating system of the cooling tower №2. Supply and assembling of circulation pipelines. Laying foundations for steam and gas turbines. Assembling of the steam turbine (PT-150-7.7) and auxiliary equipment (Unit №2).
Sochi TPP (Russia) Assembling of HRSG, gas pipelines and gas turbines.

2010

NPP «Bushehr» (Islamic Republic of Iran) Assembling of the turbine unit (K-1000-60/3000-3).
Talimarjan TPP (Uzbekistan) Maintenance of the unit №1. Turbine and auxiliary equipment inspection.
Urengoyskaya GRES Power Plant (Russia) PGU-450 (CCPP 450 MW) construction. Overhead cranes assembling. Laying foundations for gas turbines.
Razdan TPP (Republic of Armenia) Assembling of the turbine, generator and auxiliary equipment (Unit 300 MW).
Ivanovo GRES Power Plant (Ivanovskie PGU) (Russia) Assembling of the steam turbine (K-110-6.5) and auxiliary equipment. Major repair the generator (TGF-110-2-UZ).
Kaliningrad TPP-2 (Russia) Construction of the unit gas conditioning station, assembling of high and low pressure pipelines of unit №2. Renovation of the high pressure steam superheater of HRSG (P-96), water-treatment plant.
Uzhnaya CHPP-22 (Russia) Assembling of the steam turbine (PT-150-7.7) and auxiliary equipment. High and low pressure pipelines assembling.

2011

NPP «Bushehr» (Islamic Republic of Iran) Assembling of the turbine unit (K-1000-60/3000-3).
Cherepetskaya GRES Power Plant (Russia) Assembling of the steam turbine (K-225-12.8-4R), main and auxiliary equipment, high and low pressure pipelines, firefighting water system and industrial sewage (Unit №8).
Talimarjan TPP (Uzbekistan) Repair of the main and auxiliary equipment (Unit №1).
Urengoyskaya GRES Power Plant (Russia) Assembling of the steam turbine (K-160-7.5), main and auxiliary equipment, high and low pressure pipelines and in-plant gas pipelines.
Razdan TPP (Republic of Armenia) Assembling of the turbine, generator and auxiliary equipment (Unit 300 MW).
Ivanovo GRES Power Plant (Ivanovskie PGU) (Russia) Assembling of the steam turbine (K-110-6.5) and auxiliary equipment. Major repair the generator (TGF-110-2-UZ).
Kaliningrad TPP-2 (Russia) Construction of the unit gas conditioning station, assembling of high and low pressure pipelines of unit №2. Renovation of the high pressure steam superheater of HRSG (P-96), water-treatment plant.
Uzhnaya CHPP-22 (Russia) Renovation of condensate purification plant and rotor turning gear.

2012

NPP «Bushehr» (Islamic Republic of Iran) Assembling and renovation works of the turbine set (K-1000-60/3000-3)
Cherepetskaya GRES Power Plant (Russia) Assembling of the steam turbine with condenser, auxiliary equipment of turbine hall, turbine internal piping and generator (Unit №9). Additional work for installation of makeup water piping (Unit №8).
Talimarjan TPP (Uzbekistan) Repair of the main and auxiliary equipment (Unit №1).
Urengoyskaya GRES Power Plant (Russia) Check-up of the low pressure piping valves of STP and GTP. Installation of metal structures in main building. Laying foundations for steam turbine.
Razdan TPP (Republic of Armenia) Assembling of the turbine, generator and auxiliary equipment (Unit 300 MW).
Nizhnevartovskaya GRES Power Plant (Russia) Construction of the unit №3. Assembling of steam turbine, main and auxiliary equipment, high and low pressure pipelines and circulating pipelines.
Vladimir CHPP-2 (Russia) Assembling of the steam turbine T-63/76-8.8, main and auxiliary equipment, high and low pressure pipelines and overhead cranes.

2013

NPP «Bushehr» (Islamic Republic of Iran) Repair of the turbine (K-1000-60/3000-3)
Cherepetskaya GRES Power Plant (Russia) Assembling of the steam turbine with condenser, auxiliary equipment of turbine hall, turbine internal piping and generator (Unit №9). Additional work for installation of makeup water piping (Unit №8).
Talimarjan TPP (Uzbekistan) Repair of the main and auxiliary equipment (Unit №1).
Urengoyskaya GRES Power Plant (Russia) Check-up of the low pressure piping valves of STP and GTP. Installation of metal structures in main building. Laying foundations for steam turbine.
Razdan TPP (Republic of Armenia) Assembling of the turbine, generator and auxiliary equipment (Unit 300 MW).
Nizhnevartovskaya GRES Power Plant (Russia) Construction of the unit №3. Assembling of steam turbine, main and auxiliary equipment, high and low pressure pipelines and circulating pipelines.
Vladimir CHPP-2 (Russia) Assembling of the turbine, metal structures and turbine operating floors.
TPP Harta (Iraq) Check-up and assembling of the feed water pumps. Technical assistance for turbine shop.

2014

NPP «Bushehr» (Islamic Republic of Iran) Repair of the turbine (K-1000-60/3000-3) and main equipment
Cherepetskaya GRES Power Plant (Russia) Assembling of high pressure pipelines (Unit №9). Assembling of turbine internal piping, generator and condenser (Unit №8).
Tashkent TPP (Uzbekistan) Constriction of the “PGU-370” (CCPP). Main building. Assembling of the gas turbine, steam turbine, HRSG, exhaust stack, main and auxiliary equipment, high and low pressure pipelines, fuel gas preparation unit.
Talimarjan TPP (Uzbekistan) Repair of the main and auxiliary equipment (Unit №1).
Urengoyskaya GRES Power Plant (Russia) Repair of the generator (TZFP-160-2MUZ)
Razdan TPP (Republic of Armenia) Assembling of the turbine, generator and auxiliary equipment (Unit 300 MW).
Razdan TPP (Republic of Armenia) Repair of the turbine (K-300-240-3).
Nizhnevartovskaya GRES Power Plant (Russia) Construction of the unit №3. Assembling of steam turbine, main and auxiliary equipment, high and low pressure pipelines and circulating pipelines.
Vladimir CHPP-2 (Russia) Vladimir CHPP-2 renovation.
TPP Harta (Iraq) Check-up and assembling of the feed water pumps. Technical assistance for turbine shop.

2015

NPP «Bushehr» (Islamic Republic of Iran) Major repair of the turbine set (K-1000-60/3000-3) and the power generator unit (TVV-1000)
Cherepetskaya GRES Power Plant (Russia) Assembling of high pressure pipelines (Unit №9). Assembling of turbine internal piping, generator and condenser (Unit №8).
Tashkent TPP (Uzbekistan) Constriction of the “PGU-370” (CCPP). Main building. Assembling of the gas turbine, steam turbine, HRSG, exhaust stack, main and auxiliary equipment, high and low pressure pipelines, fuel gas preparation unit.
CHPP in Sovetskaya Gavan (Russia) CHPP in Sovetskaya Gavan construction. Assembling of three steam boilers E-210-13.8-56KTC (model TPE-131).
Talimarjan TPP (Uzbekistan) Repair of the main and auxiliary equipment (Unit №1).
Urengoyskaya GRES Power Plant (Russia) Repair of the generator (TZFP-160-2MUZ)

2016

NPP «Bushehr» (Islamic Republic of Iran) Maintenance of the turbine set (K-1000-60/3000-3)
CHPP in Sovetskaya Gavan (Russia) CHPP in Sovetskaya Gavan construction. Assembling of three steam boilers E-210-13.8-56KTC (model TPE-131).

2017

CHPP in Sovetskaya Gavan (Russia) CHPP in Sovetskaya Gavan construction. Assembling of three steam boilers E-210-13.8-56KTC (model TPE-131).